FAQ

What measures can a municipality take if the "as built” EPC no longer meets the minimum energy requirements??
When should an “as built” EPC be issued?
What is an “as built” EPC?
When is it necessary to conduct a feasibility study?
What is the legal basis for the obligation to check the EPC when issuing building permits?
Is the check of the energy performance certificate (EPC) compulsory?
Who can benefit from the power category of a photovoltaic installation of up to 200 kWp without creating a cooperative?
If I want to create an energy cooperative, what roofs can I install solar panels on?